Restaurant Owner's Representative

One independent lead for your restaurant project, from the first look at a space through permits, bidding, construction and opening day.

Restaurant dining room with wood tables and pendant lights

The role

What a restaurant owner's representative does

An owner's representative is the person on your side of the table for the whole project. Everyone else on the job has their own scope to protect. The owner's rep protects yours, and keeps each party working from the same plan. Saltspec provides that role for restaurant, café and bar projects only.

The architect
designs
The engineers
stamp
The contractor
builds
The landlord
protects the building
Your owner's rep protects your budget, your schedule and your opening date.

How it runs

One lead, from first look to opening day

Most operators meet their project in pieces: a broker for the space, an architect for the drawings, a contractor for the build. Nobody owns the whole picture, and the gaps between those pieces are where budgets and schedules slip. Saltspec stays with the project through five phases, and you can bring us in at any of them.

01

Assess the space

Infrastructure, code triggers, lease terms and a first budget, before you sign.

02

Plan the project

A budget by trade, the permit sequence, a schedule, and the team the project needs.

03

Assemble the team

Architect, engineers, kitchen designer and contractor shortlists, with scopes and proposals compared on the same basis.

04

Permit and bid

Drawings tracked through plan check, and contractor bids leveled line by line so the numbers can be compared.

05

Build and open

Site meetings, pay applications and change orders reviewed, the schedule tracked, and inspections and closeout carried through to the day you can open.

Scope

What we handle during the project

Budget

One working budget by trade, updated as bids, changes and allowances move.

Schedule

A master schedule covering design, permits, long-lead equipment, construction and inspections.

Lease and landlord

The work letter, delivery condition, tenant improvement allowance draws and landlord approvals.

Design team

Coordination between the architect, engineers and kitchen designer so the drawings match the budget.

Bidding

Bid packages, contractor questions, a leveled comparison and the contract terms worth negotiating.

Construction

Regular site visits, meeting notes, and review of pay applications and change orders.

Reporting

A written update on a set cadence: budget, schedule and the decisions waiting on you.

Closeout

Punch list, final inspections, warranties, as-builts and the allowance paperwork.

Unfinished shell space with windows and a ladder
The starting point
A shell, a lease and a list of unknowns
Large restaurant dining room with tables and chairs
The goal
Doors open, on the budget you planned

Who it is for

One location or many

First restaurants and single locations

You are running a business and a construction project at the same time, usually for the first time. An owner's rep gives you someone who has seen the sequence before and can tell you which decisions matter this week and which can wait.

Growing groups and multi-unit operators

You have opened before and need capacity. Saltspec runs the project to a repeatable process with consistent reporting across sites, so your team stays on operations.

The same service is available to a property owner preparing a space for a specific restaurant tenant.

When to start

Join at any stage

The earlier the better, but the role is useful at every point.

Before the lease

Start with the space

The work starts with a feasibility review of the space, so the lease you sign matches the project you can afford.

After signing

Start with the plan

It starts with the budget, the schedule and the team, before design commits you to a number.

Already underway

Start with the facts

If the project is over budget or behind, it starts with a status review of the budget, schedule and contracts, followed by a plan to recover what can be recovered.

Clear lines

What an owner's rep does not do

Saltspec does not design, engineer or build, and does not broker space. That separation is the point: the person checking the budget and the schedule has no stake in the drawings or the construction contract.

Architectural drawings spread out on a table

Saltspec is responsible for

The working budget and the master schedule
Coordinating the team and the landlord
Leveling bids and reviewing pay applications and change orders
Reporting to you and tracking open decisions

Your team stays responsible for

Drawings and code compliance: the architect and engineers
Means and methods, supervision and site safety: the contractor
Permits and inspections: the authorities who issue them
The lease itself: you and your attorney

How fees work

A fixed fee. Never a percentage of construction cost.

Owner's representation is priced as a fixed fee set by the scope, the expected duration and the level of involvement, so the fee does not rise when the project costs more. Longer or evolving projects can run on a defined monthly arrangement.

Every proposal states

Phases included
Expected duration
Meeting and site-visit frequency
Reporting you receive
How expenses are handled
How an extension would work

Where we work

Saltspec is based in Los Angeles. Most projects are across Los Angeles and Orange County, and projects elsewhere are taken where the scope fits.

Questions

Frequently asked questions

What is the difference between an owner's rep and a general contractor?

The general contractor builds the project and is paid under the construction contract. The owner's rep works for you, reviews what the contractor prices and bills, and manages the decisions around the build. One does not replace the other.

Do I still need an architect?

Yes. Stamped drawings and code approvals come from licensed professionals. Saltspec helps you select them, defines what each is responsible for and keeps their work aligned with the budget and schedule.

When should I bring in an owner's rep?

Before the lease is signed if you can. The decisions with the largest cost are made before design starts: the space, the lease terms and the budget the design has to meet.

Can you take over a project that is already underway?

Yes. It begins with a status review of the budget, schedule and contracts so that everyone is working from the same facts.

Is owner's representation only for large projects?

No. The scope can cover the full project or selected phases, and it is sized to the project.