Restaurant Owner's Representative in Manhattan Beach
One independent lead for your Manhattan Beach restaurant project, from the first look at a space through the use permit, county health review, construction and opening day.

Who approves what
A Manhattan Beach restaurant answers to several offices at once
The city handles planning and building. The county handles health. Each review runs on its own clock, and an owner's representative keeps them moving in the right order.
Planning
Planning confirms the zone and whether the space already carries a use permit you can operate under.
Planning Commission
A use permit for an eating and drinking establishment, and for alcohol, is decided at a public hearing.
Permit conditions
Hours, outdoor seating and alcohol service are typically set as conditions of the use permit.
Building
The city reviews construction plans, issues the building permit and inspects the work.
County health
Los Angeles County Public Health reviews plans for new and remodeled food facilities before construction starts.
Fire review
Fire review can apply to hood suppression, sprinklers, alarms and occupant load, depending on the size and layout of the space.
State ABC
The California Department of Alcoholic Beverage Control issues the liquor license. It is a separate application from the city's approvals.
Your landlord
Most leases require the landlord to approve drawings before they are submitted, and some set deadlines for opening that the permit timeline has to fit inside.
Where the time goes
Three things that decide a Manhattan Beach schedule
In Manhattan Beach the questions that add time are whether the space already has a use permit, what that permit allows and what you want to do outside.
Use
Does the space have a use permit?
An eating and drinking establishment needs a use permit, and so does alcohol service. A space that has never had one, such as a shop becoming a restaurant, goes to a Planning Commission hearing first.
Conditions
What the existing permit allows
Use permits set closing hours, seating and whether alcohol is allowed, sometimes indoors only. Changing any of those means an amendment and another hearing.
Outdoors
Sidewalk and patio dining
The city adopted long-term outdoor dining rules in late 2025 covering sidewalk and private-property dining. Confirm the current clearance and alcohol rules before you design a patio.


Faster routes
Two shortcuts worth checking early
Take a space with a restaurant use permit
A new restaurant can often open under the permit already attached to the space, as long as it stays inside that permit's conditions.
Read the conditions before you sign
The hours, seating and alcohol limits in the existing permit decide whether your concept fits without a hearing.
Rules are set by the city and can change. We confirm them for your address and concept before they go into the schedule.
How fees work
A fixed fee. Never a percentage of construction cost.
Owner's representation is priced as a fixed fee set by the scope, the expected duration and the level of involvement, so the fee does not rise when the project costs more. Longer or evolving projects can run on a defined monthly arrangement.
Every proposal states
Where we work
Saltspec is based in Los Angeles and works on restaurant projects in Manhattan Beach and across Los Angeles County. The role is the same everywhere. See the full owner's representative service or all services.
Manhattan Beach questions
Does a restaurant need a use permit in Manhattan Beach?
Yes. Eating and drinking establishments need a use permit, decided by the Planning Commission at a public hearing. A space that already has one can often be reoccupied under its conditions.
Is alcohol covered by the same permit?
Alcohol service needs use permit approval as well, alongside the state license. If the existing permit does not allow alcohol, or limits where and when it is served, adding it means an amendment.
Can I add outdoor dining?
Outdoor seating is usually addressed in the use permit, and the city has separate rules for dining on the sidewalk. We confirm what applies at your address before it goes into the plan.
Who reviews the kitchen for health approval?
Los Angeles County Public Health. Plans have to be approved before construction starts.
Does Saltspec pull the permits?
No. Your architect, engineers and contractor prepare and submit their own work and stay responsible for it. Saltspec sets the sequence, tracks every review and keeps the budget and schedule honest, for a fixed fee.
Other cities
Opening a restaurant in Manhattan Beach?
Send us the address. We'll give you a free first read of the space and the approvals it is likely to need.