Restaurant Owner's Representative in Manhattan Beach

One independent lead for your Manhattan Beach restaurant project, from the first look at a space through the use permit, county health review, construction and opening day.

Restaurant dining room with wood tables, pendant lights and exposed ductwork

Who approves what

A Manhattan Beach restaurant answers to several offices at once

The city handles planning and building. The county handles health. Each review runs on its own clock, and an owner's representative keeps them moving in the right order.

Planning

Planning confirms the zone and whether the space already carries a use permit you can operate under.

Planning Commission

A use permit for an eating and drinking establishment, and for alcohol, is decided at a public hearing.

Permit conditions

Hours, outdoor seating and alcohol service are typically set as conditions of the use permit.

Building

The city reviews construction plans, issues the building permit and inspects the work.

County health

Los Angeles County Public Health reviews plans for new and remodeled food facilities before construction starts.

Fire review

Fire review can apply to hood suppression, sprinklers, alarms and occupant load, depending on the size and layout of the space.

State ABC

The California Department of Alcoholic Beverage Control issues the liquor license. It is a separate application from the city's approvals.

Your landlord

Most leases require the landlord to approve drawings before they are submitted, and some set deadlines for opening that the permit timeline has to fit inside.

Where the time goes

Three things that decide a Manhattan Beach schedule

In Manhattan Beach the questions that add time are whether the space already has a use permit, what that permit allows and what you want to do outside.

Use

Does the space have a use permit?

An eating and drinking establishment needs a use permit, and so does alcohol service. A space that has never had one, such as a shop becoming a restaurant, goes to a Planning Commission hearing first.

Conditions

What the existing permit allows

Use permits set closing hours, seating and whether alcohol is allowed, sometimes indoors only. Changing any of those means an amendment and another hearing.

Outdoors

Sidewalk and patio dining

The city adopted long-term outdoor dining rules in late 2025 covering sidewalk and private-property dining. Confirm the current clearance and alcohol rules before you design a patio.

Unfinished shell space with windows and a ladder
The starting point
A shell, a lease and a list of unknowns
Large restaurant dining room with tables and chairs
The goal
Doors open, on the budget you planned

Faster routes

Two shortcuts worth checking early

Take a space with a restaurant use permit

A new restaurant can often open under the permit already attached to the space, as long as it stays inside that permit's conditions.

Read the conditions before you sign

The hours, seating and alcohol limits in the existing permit decide whether your concept fits without a hearing.

Rules are set by the city and can change. We confirm them for your address and concept before they go into the schedule.

How fees work

A fixed fee. Never a percentage of construction cost.

Owner's representation is priced as a fixed fee set by the scope, the expected duration and the level of involvement, so the fee does not rise when the project costs more. Longer or evolving projects can run on a defined monthly arrangement.

Every proposal states

Phases included
Expected duration
Meeting and site-visit frequency
Reporting you receive
How expenses are handled
How an extension would work

Where we work

Saltspec is based in Los Angeles and works on restaurant projects in Manhattan Beach and across Los Angeles County. The role is the same everywhere. See the full owner's representative service or all services.

Manhattan Beach questions

Does a restaurant need a use permit in Manhattan Beach?

Yes. Eating and drinking establishments need a use permit, decided by the Planning Commission at a public hearing. A space that already has one can often be reoccupied under its conditions.

Is alcohol covered by the same permit?

Alcohol service needs use permit approval as well, alongside the state license. If the existing permit does not allow alcohol, or limits where and when it is served, adding it means an amendment.

Can I add outdoor dining?

Outdoor seating is usually addressed in the use permit, and the city has separate rules for dining on the sidewalk. We confirm what applies at your address before it goes into the plan.

Who reviews the kitchen for health approval?

Los Angeles County Public Health. Plans have to be approved before construction starts.

Does Saltspec pull the permits?

No. Your architect, engineers and contractor prepare and submit their own work and stay responsible for it. Saltspec sets the sequence, tracks every review and keeps the budget and schedule honest, for a fixed fee.