Restaurant Owner's Representative in Long Beach

One independent lead for your Long Beach restaurant project, from the first look at a space through city plan check, health approval, construction and opening day.

Aerial view of downtown Long Beach and the beach

Who approves what

A Long Beach restaurant answers to several offices at once

Most of these sit inside the City of Long Beach, but each review still runs on its own clock. An owner's representative keeps them moving in the right order.

Building and Safety

The Building and Safety Bureau reviews plans, issues the building permit and inspects the work.

Planning Bureau

Planning confirms the restaurant use is allowed at the address, decides whether a use permit applies and handles the city's alcohol approval.

City Health Department

The Bureau of Environmental Health checks food facility plans in coordination with Building and Planning, then issues the health permit.

Fire Department

Fire review can apply to hood suppression, sprinklers, alarms and occupant load, depending on the size and layout of the space.

State ABC

The California Department of Alcoholic Beverage Control issues the liquor license. It is a separate application from the city's approval.

Coastal Zone

Parts of downtown and the waterfront are in the Coastal Zone, where a restaurant approval can also need a local coastal development permit.

Sewer and grease

Sewer connection permits are issued through the city's permit center. Raise grease interceptor requirements early, because they affect both the plumbing design and the budget.

Your landlord

Most leases require the landlord to approve drawings before they are submitted, and some set deadlines for opening that the permit timeline has to fit inside.

Where the time goes

Three things that decide a Long Beach schedule

Long Beach runs more of the process in-house than most cities in the county, which helps once you know which office decides what.

Use

Zoning before the lease

The city's own guidance is to confirm with the Planning Bureau that the address allows a restaurant, and whether a use permit applies, before you sign. Ask Building and Safety whether the existing improvements were ever permitted.

Alcohol

The bar decides the route

A restaurant that serves alcohol only with meals, has no fixed bar and keeps alcohol to 30 percent of sales or less can qualify for an exemption approved at staff level. A fixed bar generally means a conditional use permit and a Planning Commission hearing.

Health

The city's own health department

Long Beach reviews kitchens through its Bureau of Environmental Health, not the county. A new facility, or one reopening after more than 30 days closed, needs its approval before opening to the public.

Unfinished shell space with windows and a ladder
The starting point
A shell, a lease and a list of unknowns
Large restaurant dining room with tables and chairs
The goal
Doors open, on the budget you planned

Faster routes

Two shortcuts worth checking early

The alcohol permit exemption

Long Beach exempts restaurants that serve alcohol only with meals from the conditional use permit. Designing the room without a fixed bar can keep the approval at staff level and avoid a public hearing.

A restaurant-to-restaurant takeover

A space that already has permitted restaurant improvements and a recent health permit is a shorter path than a conversion. The permit history for the address shows which one you are looking at.

Rules are set by the city and can change. We confirm them for your address and concept before they go into the schedule.

How fees work

A fixed fee. Never a percentage of construction cost.

Owner's representation is priced as a fixed fee set by the scope, the expected duration and the level of involvement, so the fee does not rise when the project costs more. Longer or evolving projects can run on a defined monthly arrangement.

Every proposal states

Phases included
Expected duration
Meeting and site-visit frequency
Reporting you receive
How expenses are handled
How an extension would work

Where we work

Saltspec is based in Los Angeles and works on restaurant projects in Long Beach and the neighboring cities. The role is the same everywhere. See the full owner's representative service or all services.

Long Beach questions

Who reviews the kitchen for health approval in Long Beach?

The Long Beach Department of Health and Human Services, through its Bureau of Environmental Health. Long Beach is one of the few cities in Los Angeles County that the county health department does not cover.

Can I serve alcohol without a conditional use permit?

Often, if you are a restaurant. The city can approve an exemption at staff level where alcohol is served only with meals, there is no fixed bar and alcohol is 30 percent of sales or less. Otherwise a conditional use permit with a public hearing applies. Either way you still need a state ABC license.

I am taking over a closed restaurant. Do I need health approval again?

If the facility has been closed for more than 30 days, the health department's approval is required before it reopens to the public. Whether plans are needed depends on what you change.

Does the Coastal Zone affect a restaurant?

It can. Some downtown and waterfront addresses need a local coastal development permit alongside the use or alcohol approval. It is worth checking before the lease is signed.

Does Saltspec pull the permits?

No. Your architect, engineers and contractor prepare and submit their own work and stay responsible for it. Saltspec sets the sequence, tracks every review and keeps the budget and schedule honest, for a fixed fee.