One independent lead for your Santa Monica restaurant project, from the first look at a space through city plan check, county health approval, construction and opening day.

Who approves what
A Santa Monica restaurant answers to several offices at once
The city handles building, planning and outdoor dining. The county handles health. Each review runs on its own clock, and an owner's representative keeps them moving in the right order.
Building and Safety
The city's Building and Safety division reviews plans, issues the building permit and inspects the work.
City Planning
Planning confirms the restaurant use is allowed at the address and handles the city's alcohol approval.
County Public Health
Los Angeles County's Environmental Health plan check approves the kitchen layout, finishes and equipment before construction starts, then issues the health permit.
Fire Department
Beyond the usual review of suppression and occupancy, the Santa Monica Fire Department permits propane heaters used in outdoor dining areas.
State ABC
The California Department of Alcoholic Beverage Control issues the liquor license. It is a separate application from the city's approval.
Outdoor dining programs
Sidewalk dining, parklets and private outdoor space each have their own permit or license under the Santa Monica Outdoors programs.
Design review
Some exterior work and outdoor spaces go to the Architectural Review Board. Code-compliant signs are approved at staff level.
Your landlord
Most leases require the landlord to approve drawings before they are submitted, and some set deadlines for opening that the permit timeline has to fit inside.
Where the time goes
Three things that decide a Santa Monica schedule
Santa Monica has a reputation for strict zoning, but the city has spent the last few years removing hearings for restaurants. Knowing which rules changed saves months.
Use
Taking over an existing restaurant
A non-conforming restaurant space can be reoccupied by a new restaurant tenant without new zoning approvals. That makes the previous use of the space one of the first things to confirm.
Alcohol
Exemption or conditional use
Many restaurants can get the city's alcohol approval through a streamlined Alcohol Exemption permit with set operating conditions. A concept that does not fit those conditions goes through a conditional use permit.
Outdoors
Sidewalk, parklet or patio
Each kind of outdoor space has its own program and license. Designs with canopies, barriers or heaters can add reviews by Building and Safety, Planning, Mobility or Fire.


Faster routes
Two shortcuts worth checking early
The Alcohol Exemption permit
Santa Monica's Alcohol Exemption is a streamlined alternative to a conditional use permit. The city has widened who can use it and, in the downtown area, removed the right to appeal exemptions for restaurants with more than 50 seats.
Simple tables and chairs
For sidewalk seating with no barrier or railing, the city's Simple Table and Chairs program is the lightest route to outdoor dining in the public right-of-way.
Rules are set by the city and can change. We confirm them for your address and concept before they go into the schedule.
How fees work
A fixed fee. Never a percentage of construction cost.
Owner's representation is priced as a fixed fee set by the scope, the expected duration and the level of involvement, so the fee does not rise when the project costs more. Longer or evolving projects can run on a defined monthly arrangement.
Every proposal states
Where we work
Saltspec is based in Los Angeles and works on restaurant projects in Santa Monica and the neighboring cities. The role is the same everywhere. See the full owner's representative service or all services.
Santa Monica questions
Do I need a conditional use permit to serve alcohol in Santa Monica?
Not always. Many restaurants qualify for the city's Alcohol Exemption permit, which is a streamlined review with standard operating conditions. If the concept does not fit, a conditional use permit applies. Either way you still need a state ABC license.
Who reviews the kitchen for health approval?
Los Angeles County Public Health, through its Environmental Health plan check program. Santa Monica does not run its own health department. Plans have to be approved before construction starts.
Can I take over a restaurant space that does not meet current zoning?
In many cases, yes. The city allows a non-conforming restaurant space to be reoccupied by a new tenant with the same type of use without new zoning approvals. Confirm the status of the specific address first.
How does outdoor dining work?
Through three city programs: sidewalk dining, parklets in the parking lane, and private outdoor space on your own property. Each needs its own permit or license, and the parklet program has been permanent since October 2022.
Does Saltspec pull the permits?
No. Your architect, engineers and contractor prepare and submit their own work and stay responsible for it. Saltspec sets the sequence, tracks every review and keeps the budget and schedule honest, for a fixed fee.