Restaurant Owner's Representative in Los Angeles

One independent lead for your Los Angeles restaurant project, from the first look at a space through city plan check, county health approval, construction and opening day.

Downtown Los Angeles skyline at sunrise

Who approves what

A Los Angeles restaurant answers to several agencies at once

No single office signs off on a restaurant in the City of Los Angeles. Each of these reviews runs on its own clock, and an owner's representative keeps them moving in the right order.

Building and Safety

LADBS runs plan check, issues the building permit and inspects the work. Small interior jobs can clear at the counter. A change of use goes through regular plan check.

County Public Health

The county's Environmental Health plan check approves the kitchen layout, finishes and equipment before construction starts, then issues the health permit to operate.

City Planning

Planning confirms the restaurant use is allowed on the parcel and handles the city's approval to serve alcohol.

LA Sanitation

The Industrial Waste Management Division regulates what a kitchen sends to the sewer, which is where the grease interceptor is reviewed.

Fire Department

LAFD review can apply to hood suppression, sprinklers, alarms and occupant load, depending on the size and layout of the space.

State ABC

The California Department of Alcoholic Beverage Control issues the liquor license. It is a separate application from the city's approval.

Street and sidewalk

Sidewalk and on-street dining sit in the public right-of-way and need a revocable permit. A patio on private property goes through a building permit.

Your landlord

Most leases require the landlord to approve drawings before they are submitted, and some set deadlines for opening that the permit timeline has to fit inside.

Where the time goes

Three things that decide a Los Angeles schedule

Most of the delay on a Los Angeles restaurant is set before design starts, by what the space was last used for and what you plan to serve.

Use

Change of use

If the last tenant was a shop or an office, the city treats your restaurant as a change of use. That means full plan review, a new certificate of occupancy and a parking check that a like-for-like restaurant takeover avoids.

Alcohol

How you get approval to serve

Serving alcohol needs city approval as well as a state license. The city side is either a conditional use permit with a public process, or the shorter Restaurant Beverage Program where the address and the concept qualify.

Health

County plan check

Los Angeles County Public Health reviews the kitchen separately from the city. A new operator who changes the layout or equipment, or a space that has sat closed, can be sent back through plan check even if it ran as a restaurant before.

Unfinished shell space with windows and a ladder
The starting point
A shell, a lease and a list of unknowns
Large restaurant dining room with tables and chairs
The goal
Doors open, on the budget you planned

Faster routes

Two shortcuts worth checking early

Expedited review for restaurant interiors

LADBS offers an expedited review for interior tenant improvements to food establishments when the plans are certified by a qualified professional. It does not cover a change of use, major structural work or unreinforced masonry buildings.

Restaurant Beverage Program

Since 2022, eligible sit-down restaurants in mapped areas can get the city's alcohol approval through an administrative clearance instead of a conditional use permit. The city's zoning map shows whether a parcel is in an eligible area.

Eligibility is set by the city and can change. We confirm it for your address and concept before it goes into the schedule.

How fees work

A fixed fee. Never a percentage of construction cost.

Owner's representation is priced as a fixed fee set by the scope, the expected duration and the level of involvement, so the fee does not rise when the project costs more. Longer or evolving projects can run on a defined monthly arrangement.

Every proposal states

Phases included
Expected duration
Meeting and site-visit frequency
Reporting you receive
How expenses are handled
How an extension would work

Where we work

Saltspec is based in Los Angeles and works on restaurant projects across the city and the neighboring cities. The role is the same everywhere. See the full owner's representative service or all services.

Los Angeles questions

Do I need a change of use permit to open a restaurant in Los Angeles?

If the space was last legally used as a restaurant, usually not. If it was a shop, an office or another use, the city requires a change of use, which brings plan review and a new certificate of occupancy. The existing certificate of occupancy for the address is the place to check.

Who reviews the kitchen for health approval?

Los Angeles County Public Health, through its Environmental Health plan check program. The City of Los Angeles does not run its own health department. Plans have to be approved before construction starts.

Can I serve alcohol without a conditional use permit?

Sometimes. The Restaurant Beverage Program gives eligible sit-down restaurants a shorter administrative route, with conditions on how the restaurant operates. If the address or the concept does not qualify, the conditional use permit is the route. Either way you still need a state ABC license.

Is outdoor dining still allowed?

Yes. The city made its Al Fresco program permanent. Sidewalk and on-street dining need a revocable permit, and outdoor dining on private property is approved through a building permit.

Does Saltspec pull the permits?

No. Your architect, engineers and contractor prepare and submit their own work and stay responsible for it. Saltspec sets the sequence, tracks every review and keeps the budget and schedule honest, for a fixed fee.